16
09
Guangzhou Honda foundry wastewater treatment case
0 views
A preliminary contract has been signed with an automobile manufacturer in Guangdong to treat machine processing and foundry wastewater 35 tons per day, pre-painting wastewater treatment and painting circulating water 65 tons per day, designed electrode area of 60 square meters, energy consumption 4600KWH per day, engineering The total construction cost is 7.1 million yuan. If it is only operated in the valley, the local valley electricity price is 0.38 yuan, and the daily cost is only 1748 yuan, which is a net saving of 10,000 yuan/day compared with the original daily operating cost of 12,000 yuan.