29
06
Environmental Protection Company Emulsion Wastewater
0 views
The pilot test site of our company in cooperation with an environmental protection company – Emulsion Wastewater Treatment.
The appearance of the product engineering site, the BDD pilot module, contains emulsion wastewater.
The original process cost is more than 1000 yuan per ton of water, while the establishment cost of our electrode module is more than 400 kWh, the daily wastewater treatment volume is 2T, and the electrode area is 2 square meters.
Depending on the wastewater treatment volume, the electrode module can be increased continuously, basically without increasing the floor space.