17
09
Emulsion Wastewater Treatment Case
0 views
Liaoning DXX Environmental Protection Company Emulsion Wastewater Treatment Case
Our company cooperates with an environmental protection company in the pilot test site, the appearance of the product engineering site, the pilot test equipment, containing emulsion wastewater, the original process cost more than 1,000 yuan per ton of water, and the establishment cost of our electrode module is more than 400 degrees Electricity, daily wastewater treatment is 2T, electrode area is 2 square meters, according to wastewater treatment volume, electrode modules can be added continuously, basically without additional floor space.
> Next: Diamond powder application case